|
Reg. No. 162\1991-92
Shri Vishwakarma Jangid Karmchari Samiti 3/25, Varun Path, Mansarovar, Jaipur, Raj.
Working of Presidents in their time period:
Sh. Girdhari Lal Manduniya (1995-96)
- Collection of Rs. 3,28,000=00 upto 6-12-96 for the purchase of 1000 Sq. Mtr. land for Samaj from Housing Board and spend their valuable time for
collection from:
Shri Radhey Shyam Sharma (Gogoriya) AMIN Shri Devi Sahai Jangid, Compounder Shri Hukam Chand
(Hukam Associates) Shri Damodar Prasad Sharma (GWD, Kota) Shri Hanuman Sahai Sharma (PWD) Shri Laxmi Narayan Singhwalia
- During their period, 79 New Members and 33 Life Members were added to Samiti.
Sh. Dinesh Chandra Sharma (1996-98)
- 8 Members team was selected for collection of money for the purchase of 1000 Sq. Mtrs. Land.
- Rajasthan Housing Board alloted 1000 Sq. Mtrs. land to samiti vide letter no. 3621 dated 9-9-96 at Mansarovar Sector 3 on Varun Path.
- Rs. 3,27,800=00 were to be deposited by the Samiti by the date 8-12-96 and other wise 20% fine was there.
- By the affort of Sh. Anand Swaroop Sharma ,Additional Chief Engineer (Raj. Housing Board), Sh. M.L. Jangid, Secretary and Sh. Khemraj Jangid 1000 Sq. Mtrs. land was allotted to
Samiti and a payment of Rs. 3,28,000=00 was made.
- An additional 300 Sq. Mtr. land was also allotted to samiti by Housing Board, on date 5-6-98 for which a amount of Rs. 2,07,441= 00 was to be deposited with in three
months.
Sh. Suraj Mal Kedwal (1998-2000)
- A Sum of Rs. 1,15,000=00 of donation was available on 28 June 1998 for the construction of temple and hostel/ rest-house.
- On dated 4-1-99 additional 300 Sq. Mtrs. land was also taken in possession by the samiti and the boundary wall and gate was constructed.
- The Tentative layout of 50M*36M land was made by Sh. G.S.R. Jala (Retd. Chief Architecture).
Sh. Ram Dayal Sharma (2000-02)
- Inaguration of Office of samiti on dated 5 Aug. 2005 at Varun Path, Mansarovar, Jaipur,Raj. was done by Sh. J.P. Sharma.
- The Boundary wall of 100'*8.5' was constructed under the supervision and guidance of Sh. Ratan Chand Sharma (AEN).
- 100'*20' loan was developed and 10'*10', 20'*20' two rooms and 30'*10' Tin shed, 2 toilets and drainage, was completed in the supervision of Sh. Mool Chand Bisayati (Aug 2000 to Feb
2002).
Sh. Mangi Lal Jangid (2002-04)
- Obtained the sanction of rebate in Income under the Act of 80G from Income Tax Deptt. upto 31-3-2003.
- Sh. T.R. Sharma was appointed for Architect and Structural Designing.
- On Date 4-10-2003 at 11.00 AM the inaguration of Vishwakarma Temple and Hostel Shilanyas was held. Sh. Radhey Shyam R. Sharma and Sh. Kanti Prasad "Tiger", Delhi were the Chief Guest of
Programme.
- A tube well was bored by M/s. Jai Shree Tube Well Co. Jaipur, Raj. through Sh. Bhanwar Lal Khowal.
Sh. Dinesh Chandra Sharma (2004-06-08)
- A water hut was started functioning.
- The Construction at the land was started and basement of 40'*70' and roof was completed till Oct 2004. The place is now available for rent & other
porgrammes.
- Hostel facility was started. There were 5 students enrolled in hostel.
- Visitor from nearby villages take benefits of bhawan for passing the night for stay.
- Many programmes such as Vishwakarma Jayanti, Republic Day, Independance Day, Competitions, are organised in campus.
- Facilities for water & electricity is also rectified. Bathroom & faciltiies are also provided.
- Lawn was developed. Trees & plants are developed in area.
- Rain Water collection system is developed.
- Chowkidar hut & residence is also under construction.
- Scholarship facility, Book bank, Coaching classes to students are provided.
- Education Fund is also under process.
- Temple construction is under full swing.
Main Page
Working Committee
Activities of Samiti
Committee for Temple/Hostel
Members of Bandhutav Sandesh
Members of Shri Vishwakarma Jangid Karmchari Samiti
|
|